Heat Treatment

More than 200.000 tons of steel are treated by these means in the treatment facilities from Bochumer Eisenhütte Heintzmann.

In consequence the steel has better mechanical properties, is much more flexible for bending, less deformable and is less sensitive to ageing.

Proof of mechanical, metallographic and chemical material characteristics are made within 24 hours. The affordable test control units at site have the accuracy class 1 with MPA and DB approval.